High-Speed Rail Project Between Quebec City and Toronto Could Boost Canada’s GDP by $24.5 Billion Annually
📅 Today
A recent study indicates that a high-speed train line connecting Quebec City and Toronto could significantly enhance Canada's GDP, driven by productivity gains.
MONTREAL — A newly released study highlights that a proposed high-speed train line linking Quebec City and Toronto could contribute an impressive $24.5 billion annually to Canada's economy, primarily through enhanced productivity. This analysis was commissioned by Alto, a Crown corporation overseeing the ambitious rail project, and conducted by Aviseo Conseil, a Montreal-based economic and strategic advisory firm. The report was made public last Thursday and emphasizes the potential economic impact of reducing the 'economic distance' between businesses and their clients.Economist Jean-Pierre Lessard, a co-founder and partner at Aviseo, articulated that the high-speed train would facilitate closer connections among businesses and their clientele, resulting in significant productivity benefits. He stated, "This creates significant productivity gains that ripple throughout the entire economy, and that’s how we arrive at $24.5 billion year after year."
The proposed high-speed rail project, known as Alto, spans 1,000 kilometers and aims to connect several key locations including Quebec City, Trois-Rivières, Laval, Montreal, Ottawa, Peterborough, and Toronto. A station in Kingston is also under consideration. The train is designed to operate on newly constructed dedicated tracks, reaching speeds of up to 300 km/h, thereby enabling travel between Montreal and Toronto in a mere three hours.
The initiative gained governmental support when Prime Minister Justin Trudeau's administration announced in February 2025 that it would advance the project managed by Alto. However, the proposal has faced significant opposition from the Conservative Party and residents living along the planned route. Agricultural organizations from Quebec, Ontario, and across Canada have expressed concerns, urging the federal government to reconsider the project due to fears of potential cost overruns and detrimental impacts on agricultural land.
Despite these concerns, the economic analysis suggests that neglecting the Alto high-speed rail line could result in a staggering loss of over $50 billion for Quebec and Ontario by the year 2050. This estimate is based on projected annual intercity travel on the proposed rail routes, which currently sees approximately 80 million trips per year, including major routes like Montreal–Quebec City and Montreal–Toronto. The study forecasts that this figure could increase to 115 million trips by 2059.
Lessard pointed out that without the introduction of this high-speed rail service, the growing travel demand would necessitate substantial infrastructure expansions, including more highway lanes, overpasses, and possibly even a new highway. He stressed that the existing infrastructure is already nearing saturation and that the proposed high-speed train offers a more efficient solution.
The 80-page report draws upon analyses spanning the last 50 years and the successful implementation of high-speed rail systems in over 20 countries worldwide. While it thoroughly examines the benefits of the project, it notably does not provide a detailed cost-benefit analysis, as the costs remain uncertain. Alto has projected construction costs between $60 billion and $90 billion, while the Parliamentary Budget Officer previously estimated costs ranging from $75 billion to $113 billion, with some experts citing figures as high as $150 billion.
Nevertheless, Lessard emphasized that the focus of the study was to underscore the economic advantages of the proposed rail line. He highlighted that the potential economic contributions could account for approximately one percent of Canada's GDP, which has experienced an annual growth rate of around two percent over the past 25 years. He likened the impact of the train line to adding an additional six months of economic growth each year.
While Alto commissioned the study, Lessard defended its integrity, asserting, "I don’t think we’d risk our reputation for the sake of marketing. It’s based on the most up-to-date literature available on international experiences." The study’s findings were also reviewed by an independent committee comprising four experts from various Canadian universities.
🏷️
Alto project
travel demand
productivity gains
economic growth
high-speed rail
Toronto
Quebec City
public transit
Infrastructure
agricultural impact