Top Pre-Bid Hotel and Motel Projects in Ontario as of November 2026
📅 4 days ago
This article highlights the eleven leading pre-bid hotel and motel projects in Ontario, detailing their value, design, and location.
As of November 16, 2026, Ontario is poised for significant growth in its hospitality sector, with eleven prominent pre-bid hotel and motel projects emerging across the province. These projects, ranked by value, showcase the increasing demand for diverse accommodations and mixed-use developments.Leading the list is the King Road Mixed-Use Residential Community in Burlington, which is set to transform the area with a staggering project value of CAD 1,775,500,000. This ambitious development will feature a 175,183-square-foot stadium, a 146,466-square-foot clubhouse, and an impressive 8,823-unit multi-residential development among other facilities, including a 175,423-square-foot hospitality development and a 141,223-square-foot office space. The project is currently in the design stage, aiming to cater to a variety of community needs while enhancing the local economy.
Following closely is the Toria Commons in Whitby, which is also a mixed-use development with a projected value of CAD 1,400,000,000. This development will include a 41-story building housing 7,034 residential units and a hotel with 401 rooms. The project is expected to significantly contribute to Whitby’s urban landscape and is currently in the design phase.
In Niagara Falls, the Niagara Falls Hotel Towers is making headlines with its planned construction of two hotel towers—one 60 stories high and the other 61 stories. This mixed-use development is valued at CAD 700,000,000 and will include retail and restaurant spaces, alongside five residential units. The ambitious design aims to enhance the tourism appeal of Niagara Falls, a key destination in Ontario.
Other noteworthy projects include the Project Bench in Vineland Station, which is valued at CAD 500,000,000, and the 6609 Stanley Avenue project in Niagara Falls, estimated at CAD 400,000,000. Both projects are designed to meet the growing demand for hospitality and residential spaces in their respective regions.
The Barrie Waterfront Towers in Barrie is also in the spotlight with a projected value of CAD 382,500,000, focusing on mixed-use residential towers and hotel facilities. Additionally, the 7028 Yonge Street development in Thornhill and the Stanley and Dunn project in Niagara Falls, valued at CAD 292,500,000 and CAD 230,000,000 respectively, are under consideration, reflecting the ongoing trend of integrating residential and hospitality spaces.
The Terminal Point Revitalization project in Collingwood is another significant venture, valued at CAD 200,000,000, aimed at combining residential and boutique hotel offerings. Lastly, the redevelopment of the Missoni Sky in Toronto, valued at CAD 145,000,000, along with the Music City Hotel in Niagara Falls, valued at CAD 130,000,000, rounds out the list of major pre-bid projects that are set to reshape Ontario’s hospitality landscape.
These projects not only highlight the financial investments being made in Ontario’s hospitality sector but also indicate a broader trend towards mixed-use developments that cater to both residential and commercial needs. As these projects move forward in their design phases, they promise to create jobs and stimulate economic growth throughout the province.
🏷️
Burlington
Urban planning
hospitality sector
Whitby
mixed-use projects
Barrie
hotel development
Niagara Falls
Ontario construction
Residential Development